New BRUSK Bruges Museum and Art Complex

New construction of the BRUSK Bruges museum and art complex
Sector
Culture
Completed
05/09/2025
Architect
Robbrecht en Daem architecten in samenwerking met Olivier Salens Architecten
Location
Bruges
Total cost
36,000,000 €
Client
Stad Brugge
Nieuwe museum- en kunstsite BRUSK Brugge
The project

De Klerck Engineering designed the complete, highly advanced all-electric HVAC concept for the new BRUSK museum and art complex in Bruges. The greatest challenge was ensuring perfectly stable and redundant climate conditions for the preservation and exhibition of extremely valuable artworks.

This was achieved through a ground-source heat pump (BEO field) coupled with low-temperature heating and high-temperature cooling, an ice storage system as a nighttime cold buffer, and an innovative air displacement ventilation system with extremely quiet floor grilles and CO₂ control. Thanks to integrated BIPV solar panels (306 kWp) on the roofs, this landmark museum concept is virtually energy-neutral.

The entire design was developed using a comprehensive BIM process with a focus on spatial coordination and clash detection.

Project

Want to learn more about this project?

Name
Nieuwe museum- en kunstsite BRUSK Brugge
Nieuwe museum- en kunstsite BRUSK Brugge
Nieuwe museum- en kunstsite BRUSK Brugge

Want to make an impact together?