Back to overview
Healthcare

Sint-Vincentius Residential Care Center - Zaffelare

Replacement of an existing care facility with a new building with 123 residential units and demolition of the existing facility (Engineering & Build)

Sector
Healthcare
Completed
08/07/2021
Architect
DETOO Architects bv
Location
Lochristi
Total cost
11,000,000 €
Client
vzw Exalta - Sint-Vincentius
WZC Sint-Vincentius - Zaffelare
The project

De Klerck Engineering was responsible for the design of the building services and EPB reporting for the new Sint-Vincentius Residential Care Center in Zaffelare. The project included the construction of 123 residential units, a community center, and the phased demolition of the old residential care center and a preschool.

The central boiler room was equipped with gas-fired boilers operating at a 70/50°C temperature regime, combined with radiators in the rooms and underfloor heating in the cafeteria and common areas. An intelligent building management system (BMS) handles software-based energy accounting and monitoring.

Ventilation is provided by a Type D system with high-efficiency heat recovery wheels, active cooling in common areas, and passive night cooling. The concept also includes rainwater harvesting, comprehensive LED lighting with occupancy sensors, and autonomous emergency lighting with an integrated self-test mechanism.

Project

Want to learn more about this project?

Name
WZC Sint-Vincentius - Zaffelare
WZC Sint-Vincentius - Zaffelare
WZC Sint-Vincentius - Zaffelare
WZC Sint-Vincentius - Zaffelare

Want to make an impact together?